In a 16 in tube one 80 lb bag fills about 5 in of height, and a 60 lb bag about 4 in.
One cubic yard fills 4 of these columns.
Change the dimensions in the column calculator. Why every count rounds up: how many bags of concrete you need.
Column
A single 16 in diameter round column (sonotube) 4 ft tall. The volume is the circle area π·(diameter/2)² times the height; multiply by the number of piers you are pouring. That is 5.59 cubic feet, or 0.21 cubic yards: 10 bags of 80 lb premix or 13 bags of 60 lb, before any waste.
Concrete needed
| Bag size | Bags needed |
|---|---|
| 40 lb | 19 |
| 60 lb | 13 |
| 80 lb | 10 |
| 25 kg | 14 |
| 30 kg | 12 |
Same job, other sizes
In a 16 in tube one 80 lb bag fills about 5 in of height, and a 60 lb bag about 4 in.
One cubic yard fills 4 of these columns.
Change the dimensions in the column calculator. Why every count rounds up: how many bags of concrete you need.
At this size
10 × 80 lb bags is 0.21 yd³ - a wheelbarrow-and-shovel job. Mix two bags at a time, keep the water tight to the bag's own figure, and place it in one go so there is no cold joint. No mixer, no delivery, no minimum load.
| Diameter | 16 in |
|---|---|
| Height | 4 ft |
| Columns | 1 |
A round column or sonotube form holds a cylinder of concrete: area π·(diameter/2)² times its height, multiplied by how many you are pouring. Enter the tube's inside diameter - that is the finished column diameter.
That volume - 5.59 ft³ - is divided by 27 to give 0.21 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 10 of them; bag counts always round up, because you cannot buy part of a bag.
Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.