Concrete for a 30×30 ft slab, 4 in thick

A 30 × 30 ft slab covers 900 sq ft, a size used for a garage floor or a section of driveway. At 4 in thick it holds 300 cubic feet, or 11.11 cubic yards: 500 bags of 80 lb premix or 667 bags of 60 lb, before any waste.

Concrete needed

11.11cubic yards· 8.495 m³· 300 ft³
Bags of premix needed for concrete for a 30×30 ft slab, 4 in thick, by bag size.
Bag sizeBags needed
40 lb1,000
60 lb667
80 lb500
25 kg726
30 kg605
Planning estimate, with no waste allowance included. Add 5-10% for spillage and over-excavation, and check the yield printed on your bag. Structural work must follow your local building code and an engineer's specification.
Bagged or ready-mix?
Ready-mix, multiple loads
11.11 yd³ is more than one truck - about 2 loads at a typical 9 yd³. Book them back to back so the pour stays continuous, and agree where each load discharges before the first one turns up; a gap between loads on a slab this size is a cold joint you cannot cut out afterwards.

Same job, other sizes

30 × 30 ft slab

Volume for each size. The order columns add 10%, the top of the 5-10% waste allowance, and round bags up.
Sizeft³yd³yd³ to order (+10%)80 lb bags (+10%)60 lb bags (+10%)
4 in (this page)30011.1112.22550734
5 in37513.8915.28688917
6 in45016.6718.338251,100

At this size

What changes on a 30×30 ft slab, 4 in thick

What 4 in is for

900 ft² is garage-floor or driveway-section size, but 4 in is a foot-traffic thickness. Over a well-compacted sub-base it carries people, storage and the occasional light vehicle; anything that will park on it wants 5-6 in. Fibre or a 6×6 mesh sheet is common at this depth; the sub-base does more for the slab than the reinforcement does.

Control joints for this size

A 4 in slab wants control joints every 8-12 ft - 24 to 36 times its thickness. At 30 × 30 ft that is about 4 joints: 2 across the 30 ft length (3 panels of about 10 ft) and 2 across the 30 ft width (3 panels of about 10 ft). That keeps the panels close to square, which is what stops a joint being ignored and a crack appearing somewhere else. Cut or tool them about 1 in deep - a quarter of the slab - and do it within the first day, before the slab decides where to crack on its own.

Placing 900 ft²

At 30 ft across, this is past the width a screed board spans. Set 2 intermediate wet screeds or screed rails down the 30 ft direction, dividing it into strips of about 10 ft, and strike off strip by strip. 900 ft² also has to be placed and finished before the first of it sets, so this is a crew job, not a weekend-alone job.

Mixing or ordering it

500 × 80 lb bags is 11.11 yd³ - about 250 mixer batches. At this size the bag count is a costing reference rather than a plan: mixing 500 bags on site cannot keep ahead of the setting edge, so the pour ends up full of cold joints. Ordered by the yard it is about 2 loads at a typical 9 yd³ truck, booked back to back. Have the crew, the access and the discharge points sorted before anything arrives.

How it is worked out

A slab is a simple rectangular prism: multiply length × width × thickness. Enter the thickness in inches (it is usually the smallest dimension) and the plan size in feet. Four inches suits patios and walkways; drives and garage floors are usually five to six.

That volume - 300 ft³ - is divided by 27 to give 11.11 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 500 of them; bag counts always round up, because you cannot buy part of a bag.

Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.

Formwork

What is being measured

lengththicknesswidth runs into the pageSLAB · L × W × T