Slab

Concrete for an 8×8 ft slab, 4 in thick

An 8 × 8 ft slab covers 64 sq ft, a size used for a pad, a step or a small patio. At 4 in thick it holds 21.33 cubic feet, or 0.79 cubic yards: 36 bags of 80 lb premix or 48 bags of 60 lb, before any waste.

Concrete needed

0.79cubic yards· 0.604 m³· 21.33 ft³
Bags of premix needed for concrete for an 8×8 ft slab, 4 in thick, by bag size.
Bag sizeBags needed
40 lb72
60 lb48
80 lb36
25 kg52
30 kg44
Planning estimate, with no waste allowance included. Add 5-10% for spillage and over-excavation, and check the yield printed on your bag. Structural work must follow your local building code and an engineer's specification.
Bagged or ready-mix?
Bags
0.79 yd³ is under a ready-mix supplier's usual one-yard minimum, so bags are the answer whatever the price per yard says. Buy a couple more than the count above and return what you do not open.

Same job, other sizes

8 × 8 ft slab

Volume for each size. The order columns add 10%, the top of the 5-10% waste allowance, and round bags up.
Sizeft³yd³yd³ to order (+10%)80 lb bags (+10%)60 lb bags (+10%)
4 in (this page)21.330.790.874053
5 in26.670.991.094966
6 in321.191.35979

At this size

What changes on an 8×8 ft slab, 4 in thick

What 4 in is for

At 4 in this is a foot-traffic slab - a patio, a path, a shed floor or a garden-office base. 4 in over a well-compacted sub-base carries people and furniture indefinitely, and will take an occasional light vehicle if the base is right, but it is not a driveway thickness. Fibre or a 6×6 mesh sheet is common at this depth; the sub-base does more for the slab than the reinforcement does.

Control joints for this size

At 8 × 8 ft this slab is small enough to pour as a single panel. Control joints go in at roughly 8-12 ft for a 4 in slab (24-36 times the thickness), and both dimensions here are inside that, so no intermediate joint is needed - just isolation material where the slab meets a wall, a step or a post.

Placing 64 ft²

The short side is 8 ft, so a straightedge resting on both forms strikes this off in one pass - a 10 ft screed board gives you the overhang you need at each end. Work back along the 8 ft direction and the whole 64 ft² is within reach of two people without stepping in it.

Mixing or ordering it

36 × 80 lb bags is 0.79 yd³, which is about 18 batches in a 6 ft³ site mixer at two bags a batch. That is a comfortable half-day for two people - one mixing, one placing - and at 0.79 yd³ you are under the one-yard minimum most ready-mix suppliers will deliver, so bagging it is the route regardless of price.

How it is worked out

A slab is a simple rectangular prism: multiply length × width × thickness. Enter the thickness in inches (it is usually the smallest dimension) and the plan size in feet. Four inches suits patios and walkways; drives and garage floors are usually five to six.

That volume - 21.33 ft³ - is divided by 27 to give 0.79 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 36 of them; bag counts always round up, because you cannot buy part of a bag.

Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.

Formwork

What is being measured

lengththicknesswidth runs into the pageSLAB · L × W × T

Nearby

Next sizes up and down