Concrete for a 20 ft curb

A 20 ft run of plain curb, 6 in wide and 18 in tall. The volume is the curb cross-section times the run.

Concrete needed

0.56cubic yards· 0.425· 15 ft³
Bags of premix needed for concrete for a 20 ft curb, by bag size.
Bag sizeBags needed
40 lb50
60 lb34
80 lb25
25 kg37
30 kg31
Planning estimate, with no waste allowance included. Add 5-10% for spillage and over-excavation, and check the yield printed on your bag. Structural work must follow your local building code and an engineer's specification.
Bagged or ready-mix?
Bags
0.56 yd³ is under a ready-mix supplier's usual one-yard minimum, so bags are the answer whatever the price per yard says. Buy a couple more than the count above and return what you do not open.

At this size

What changes on a 20 ft curb

Mixing or ordering it

25 × 80 lb bags is 0.56 yd³, which is about 13 batches in a 6 ft³ site mixer at two bags a batch. That is a comfortable half-day for two people - one mixing, one placing - and at 0.56 yd³ you are under the one-yard minimum most ready-mix suppliers will deliver, so bagging it is the route regardless of price.

How it is worked out

A curb is a long prism: its cross-section (width × height) times the run. For curb-and-gutter, the flat gutter pan (width × thickness) is added to the cross-section before multiplying by the length.

That volume - 15 ft³ - is divided by 27 to give 0.56 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 25 of them; bag counts always round up, because you cannot buy part of a bag.

Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.

Formwork

What is being measured

curb Wcurb Hgutter Wcross-section × runCURB & GUTTER