Mixing or ordering it
63 × 80 lb bags is 1.39 yd³ and roughly 32 mixer batches. This is the crossover point: bagging it is a full day with a mixer and at least two people, and the concrete has to keep arriving faster than the placed edge stiffens. Price 1.39 yd³ of ready-mix, short-load surcharge included, against 63 bags at your own bag price before you commit to a day of mixing.