Steps

Concrete for 6 solid steps, 4 ft wide

A solid poured staircase of 6 steps, 4 ft wide, with comfortable 7 in rises and 11 in treads. The volume is the stacked step cross-section times the width.

Concrete needed

1.66cubic yards· 1.272· 44.92 ft³
Bags of premix needed for concrete for 6 solid steps, 4 ft wide, by bag size.
Bag sizeBags needed
40 lb150
60 lb100
80 lb75
25 kg109
30 kg91
Planning estimate, with no waste allowance included. Add 5-10% for spillage and over-excavation, and check the yield printed on your bag. Structural work must follow your local building code and an engineer's specification.
Bagged or ready-mix?
Either - check the short-load fee
1.66 yd³ clears the usual one-yard minimum but sits in the short-load band, where most suppliers add a surcharge for anything under about 3-4 yd³. That fee is what decides it: get it quoted, add it to the yard price, and compare against the bag count above at your own bag price.

At this size

What changes on 6 solid steps, 4 ft wide

Mixing or ordering it

75 × 80 lb bags is 1.66 yd³ and roughly 38 mixer batches. This is the crossover point: bagging it is a full day with a mixer and at least two people, and the concrete has to keep arriving faster than the placed edge stiffens. Price 1.66 yd³ of ready-mix, short-load surcharge included, against 75 bags at your own bag price before you commit to a day of mixing.

How it is worked out

A solid poured staircase is a stack of rectangular blocks: the cross-section area is rise × run × n(n+1)/2 for n steps, and the volume is that area times the stair width. Seven-inch rises with eleven-inch runs are a comfortable, code-typical stair.

That volume - 44.92 ft³ - is divided by 27 to give 1.66 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 75 of them; bag counts always round up, because you cannot buy part of a bag.

Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.

Formwork

What is being measured

riserunarea = R·T·n(n+1)/2× widthSOLID POURED STAIRS

Nearby

More steps examples