Mixing or ordering it
45 × 80 lb bags is 0.99 yd³ and roughly 23 mixer batches. This is the crossover point: bagging it is a full day with a mixer and at least two people, and the concrete has to keep arriving faster than the placed edge stiffens. 0.99 yd³ is still under the usual one-yard delivery minimum, so plan the day around keeping the mixer fed rather than around a truck.