Mixing or ordering it
200 × 80 lb bags is 4.44 yd³ - about 100 mixer batches. At this size the bag count is a costing reference rather than a plan: mixing 200 bags on site cannot keep ahead of the setting edge, so the pour ends up full of cold joints. Ordered by the yard it is part of a single load. Have the crew, the access and the discharge points sorted before anything arrives.